The SMM on board the vessels and in the office (paper copies) are the OFFICIAL CONTROLLED copies. The SMM on this page is for general reference only.
To do a word search in the entire SMM, use the “Search the SMM” box to the right.
- Printable Table of Contents
Chapters
- Safety Management System
- Safety and Environmental Policy
- Company Responsibility and Authority
- Designated Person
- Master’s Responsibility and Authority
- Resources and Personnel
- Shipboard Operations
- Emergency Preparedness
- Non-Conformities
- Maintenance of Ship and Equipment
- Document Control and Distribution
- Company verification, Review and Evaluation
- General Policies
- Risk Assessment and Hazard Mitigation
General Standard Operating Procedures (SOPs)
- SOP-GEN-001 Bridge Procedures
- SOP-GEN-002 Chief Engineer’s Standing Orders
- SOP-GEN-003 Communications
- SOP-GEN-004 Confined Space Entry
- SOP-GEN-005 Energy Isolation
- SOP-GEN-006 Incident Reporting
- SOP-GEN-007 Waste Oil, Sewage and Trash
- SOP-GEN-008 Bunkering
- SOP-GEN-009 Working at Heights
- SOP-GEN-010 Crane and Winch Operations
- SOP-GEN-011 Small Boat Operations
- SOP-GEN-012 Medical Emergency/ MEDEVAC
- SOP-GEN-013 Emergency Response Plan
- SOP-GEN-014 Electric Safety Program
- SOP-GEN-015 Power and Hand Tools
- SOP-GEN-016 Compressed Gas Cylinders
- SOP-GEN-017 Respiratory Protection Program
- SOP-GEN-018 Management of Change
- SOP-GEN-019 Permit to Work System
- SOP-GEN-020 Lifting Gear
- SOP-GEN-021 Hazard Communication Program
- SOP-GEN-022 Bloodborne Pathogens Exposure Control Program
- SOP-GEN-023 Galley Health and Safety
- SOP-GEN-024 STCW Rest Hours Tracking
- SOP-GEN-025 On Board Complaint Procedure
- SOP-GEN-026 Hot Work and Welding
- SOP-GEN-027 Contractors
- SOP-GEN-028 Crew Management
- SOP-GEN-029 Mosquito Borne Illness Prevention
- SOP-GEN-030 Medical Care
- SOP-GEN-031 Travel Management Plan
- SOP-GEN-032 500 Meter and SIMOPS
- SOP-GEN-033 Cyber Security
Brooks McCall SOPs
- SOP-BMCC-001 Critical Equipment
- SOP-BMCC-002 Loss of Steering
- SOP-BMCC-003 Auxiliary Plant Operations
- SOP-BMCC-004 Confined Space Entry
- SOP-BMCC-005 Equipment Reset
Miss Emma McCall SOPs
- SOP-EMMA-001 Critical Equipment
- SOP-EMMA-002 Loss of Steering
- SOP-EMMA-003 Auxiliary Plant Operations
- SOP-EMMA-004 Confined Space Entry
- SOP-EMMA-005 Equipment Reset
Gyre SOPs
- SOP-GYRE-001 Critical Equipment
- SOP-GYRE-002 Loss of Steering
- SOP-GYRE-003 Auxiliary Plant Operations
- SOP-GYRE-004 Confined Space Entry
- SOP-GYRE-005 Equipment Reset
Proteus SOPs
- SOP-PRT-001 Critical Equipment
- SOP-PRT-002 Loss of Steering
- SOP-PRT-003 Auxiliary Plant Operations
- SOP-PRT-004 Confined Space Entry
- SOP-PRT-005 Equipment Reset
Nautilus SOPs
- SOP-NAUT-001 Critical Equipment
- SOP-NAUT-002 Loss of Steering
- SOP-NAUT-003 Auxiliary Plant Operations
- SOP-NAUT-004 Confined Space Entry
- SOP-NAUT-005 Equipment Reset
- SOP-NAUT-006 HiPap 502 Raise and Lower
- SOP-NAUT-007 Dynamic Positioning
- SOP-NAUT-008 Man Overboard
- SOP-NAUT-009 FRC Launch and Recover
- SOP-NAUT-010 Emergency Towing