Emma Blueprints

The table contains pdf copies of all the drawings we have on file for Miss Emma McCall as of November 2020.  If you acquire new drawings and wish to have them added, contact ShannonSmith@tdi-bi.com.

Use the search box above the table to search for drawings by name.

  
Anchor Handling :M-5 Anchor Handling - 2002
Bilge & Ballast :P-1 Bilge, Ballast & Fire System- Sheet 1
P-1 Bilge, Ballast & Fire System- Sheet 2
Bowthruster Install : M-4 Bowthruster Install- 2002
CL Profile and Longitudinal Bulkheads :S-4 Rev2 CLP Profile and Long Bhds--Sheet 1 Jan-9-2003
S-4 Rev2 CLP Profile and Long Bhds--Sheet 2 Jan-9-2003
Compressed Air System:P-6 Compressed Air Sys Diag- 2003
Dirty Oil, Lube Oil, Oily Water System :P-9 Dirty Oil, LO and Oily Water- 2002
Docking Plan :A-5 Docking Plan - 2003
Electrical :E-1 Elementary Wiring- AS BUILT - 2003
E-2 Electrical Layout- Sheets 1 & 2- 2002
Engine Cooling Water Systems :P-8 Engine Cooling Wtr System- Sheet 1- 2002
P-8 Engine Cooling Wtr System- Sheet 2- 2002
Exhaust Pipe and Vent :P-13 Exhaust Pipe and Vent- Sheet 1- 2003
P-13 Exhaust Pipe and Vent- Sheet 2- 2003
Fire Control & Life Saving Plan :A-4 Rev 0- FS & LS Plan- Jan 2003
A-4 Rev 1- FS & LS Plan- Feb 2003 (w/ ABS edits)
A-5 Rev 0- FS & LS Plan- Jan 2003
Focsl Deck House :S-5 Rev1 Focsle Deck House Jan-8-2003
Focsl Deck Scantling & Structural Bulkheads :S-3 Rev0 Focsle Dk Scant and Strl Bhds Jul-2-2002
S-3 Rev1 Focsle Dk Scant and Strl Bhds Sep-5-2002
S-3 Rev2 Focsle Dk Scant and Strl Bhds Jan-8-2003
Fuel Oil System :P-2 Fuel Oil System Diag- 2002
Scantling :S-1 Scantling Plans 1-3
Frames A - 8 :S-2 Rev0 Frames A-8 May-15-2002
S-2 Rev1 Frames A-8 Sep-5-2002
S-2 Rev2 Frames A-8 Jan-8-2003
Frames 9 - 16 :S-2A Rev0 Frames 9-16 May-28-2002
S-2A Rev1 Frames 9-16 Jan-6-2003
Frames 17 - 23 :S-2B Rev0 Frames 17-23 May-29-2002
S-2B Rev1 Frames 17-23 Jan-6-2003
Frames 24 - 38 :S-2C Frames 24-38 May-29-2002
Frames 39 - 56 :S-2D Rev0 Frames 39-56 May-24-2002
S-2D Rev1 Frames 39-56 Jan-8-2002 w/ ABS edits
Frames 57 - 65 :S-2E Rev0 Frames 57-65 May-21-2002
S-2E Rev1 Frames 57-65 Jan-8-2002
Frames 66 - Transom :S-2F Rev0 Frames 66 - Transom May-27-2002
S-2F Rev1 Frames 66 - Transom Jan-8-2002
General Arrangement :A-3 Rev1 General Arrangement May-8-2002
Liquid Mud Conversion to Fuel Oil Tank :P-12 Rev0 Liquid Mud Conversion to Fuel Oil Jul-2-2002
Main Engine Foundation :S-9 Rev1 Main Engine Foundation Aug-13-2002
Main Engine Shaft and Details :M-1 Rev0 Main Eng Shaft and Details Aug-8-2002
M-1 Rev0 Main Eng Shaft and Details Aug-8-2002 (Duplicate)
Machinery Arrangement :M-3 Rev1 Machinery Arr Aug-28-2002
Mast Arrangement and Details :S-8 Rev0 Mast Arr and Details Sep-3-2002
Outboard Profile :A-2 Rev1 Outboard Profile May-24-2002
Pilot House :S-6 Rev1 Pilot House Jan-9-2003
Potable and Sanitary Water :P-3 Rev1 Potable and Sanitary Water Jan-9-2003
Sanitary Drains System Diagram :P-4 Rev2 Sanitary Drains Sys Diag Jan-9-2003
Sea Chest and Strainer Details :P-7 Rev2 Sea Chest and Strainer Det Jan-9-2003
Steering Arrangement and Rudder Details :M-2 Rev1 Steering Arr and Rudder Det --Sheet 1 Oct-21-2002
M-2 Rev1 Steering Arr and Rudder Det --Sheet 2 Oct-21-2002
Tonnage Opening and Cover Plate :S-11 Tonn Open and Cover Plate Jan-9-2002
Vents, Fills and Sounds :P-5 Rev0 Vents Fills Sounds Jun-4-2002